As a leading prefab aviation buildings manufacturer, Liyou Steel Structure Engineering delivers high-quality, modular steel structures for airports, helipads, and aerospace facilities worldwide. Our pre-engineered aviation buildings combine durability, fast construction, and cost efficiency—ideal for:
✔ Aircraft Hangars (Private jets, helicopters, commercial fleets)
✔ Maintenance & Repair Facilities (MRO)
✔ Airport Terminals & Cargo Warehouses
✔ Control Towers & Crew Quarters
✅ Rapid Installation – 30-60% faster vs. traditional construction
✅ Clear-Span Designs – Up to 80m spans (no interior columns)
✅ Heavy-Duty Materials – Q355B/Q460C steel with corrosion-resistant coatings
✅ Custom Compliance – Meets ICAO, FAA, EASA, and local aviation codes
✅ Cost Savings – 20-40% lower than conventional builds
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Office Building
Guangdong, China
Steel Structure
3 years
total solution for projects
Office
Modern
CE Certification
Industrial Commercial
C.Z Shape Steel Channel
Sliding Door
Customized Color
Sandwich Panel Optional
Aluminum Alloy Sliding Window
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Hot Dip Galvanized
25-60 days
Single item
1X1X1 cm
1.000 kg
Price: $80-$150/m² (varies by size/specs)
Includes: Primary/secondary framing, cladding, ventilation
Lead Time: 60-90 days
Price: $120-$200/m²
Features: Fireproof panels, HVAC-ready, crane beams
Lead Time: 75-120 days
Price: Quote-based
Custom: Glass facades, boarding bridges, baggage systems
45m-span Helicopter Hangar (Philippines) – Completed in 65 days
Air Cargo Warehouse (UAE) – 12,000m², FAA-compliant
Private Jet Hangar (USA) – 80m clear span, luxury finishes
✔ 20+ Years Experience – Engineered for extreme wind/snow loads
✔ Turnkey Solutions – From design to civil engineering support
✔ Global Certifications – EN 1090, FAA, ICAO, IATA
✔ Budget Flexibility – Options from economy to premium
Need a hangar for specific aircraft? Share:
✈ Aircraft model & quantity
Site location & soil report
Special requirements (cranes, fire systems, etc.)
✈ Your trusted partner for aviation infrastructure
item | value |
Material | Steel |
After-sale Service | Online technical support |
Application | Office Building |
Place of Origin | China |
Guangdong | |
Product Type | Steel Structure |
Warranty | 3 years |
Project Solution Capability | total solution for projects |
Use | Office |
Design Style | Modern |
Certification | CE Certification |
Application Fields | Industrial Commercial |
Purlin | C.Z Shape Steel Channel |
Door | Sliding Door |
Color | Customized Color |
Wall and Roof | Sandwich Panel Optional |
Window | Aluminum Alloy Sliding Window |
Drawing Design | SAP2000/AutoCAD /PKPM /3D3S/TEKLA |
Surface treatment | Hot Dip Galvanized |
Delivery time | 25-60 days |
Price: $80-$150/m² (varies by size/specs)
Includes: Primary/secondary framing, cladding, ventilation
Lead Time: 60-90 days
Price: $120-$200/m²
Features: Fireproof panels, HVAC-ready, crane beams
Lead Time: 75-120 days
Price: Quote-based
Custom: Glass facades, boarding bridges, baggage systems
45m-span Helicopter Hangar (Philippines) – Completed in 65 days
Air Cargo Warehouse (UAE) – 12,000m², FAA-compliant
Private Jet Hangar (USA) – 80m clear span, luxury finishes
✔ 20+ Years Experience – Engineered for extreme wind/snow loads
✔ Turnkey Solutions – From design to civil engineering support
✔ Global Certifications – EN 1090, FAA, ICAO, IATA
✔ Budget Flexibility – Options from economy to premium
Need a hangar for specific aircraft? Share:
✈ Aircraft model & quantity
Site location & soil report
Special requirements (cranes, fire systems, etc.)
✈ Your trusted partner for aviation infrastructure
item | value |
Material | Steel |
After-sale Service | Online technical support |
Application | Office Building |
Place of Origin | China |
Guangdong | |
Product Type | Steel Structure |
Warranty | 3 years |
Project Solution Capability | total solution for projects |
Use | Office |
Design Style | Modern |
Certification | CE Certification |
Application Fields | Industrial Commercial |
Purlin | C.Z Shape Steel Channel |
Door | Sliding Door |
Color | Customized Color |
Wall and Roof | Sandwich Panel Optional |
Window | Aluminum Alloy Sliding Window |
Drawing Design | SAP2000/AutoCAD /PKPM /3D3S/TEKLA |
Surface treatment | Hot Dip Galvanized |
Delivery time | 25-60 days |