Project Name:
3000 Square Meters Highway Steel Bar Processing Workshop
Project Information:
Location: China
Area: 3000 square meters
Weight: 400 tons
Wind resistance: 130km/h.
Anti-seismic: 8 grade
Roof dead load: 25kg/㎡
Roof live load: 40kg/㎡
Requirements:
The steel structure workshop project is for processing the reinforcement bars for a new highway, with 50 meters large span workshop. This whole project used about 400 tons steel.
Solution:
As it is a local project, we are not only responsible for production but also installation. Our company had invested more than 60 construction personnel on site. We only spent 45 day on the completion and delivery of the whole project.
Project Name:
Guangxi Zhijiada Health Food Co., Ltd. Construction
Project Information:
Location: Guangxi Province, China
Area: 11232 square meters
Project size: 156m x 36m x 12mH(2 floors)Weight: 972 tons
Wind resistance: 110km/h
Anti-seismic: 8 grade
Roof dead load: 25kg/㎡
Roof live load: 50kg/㎡
Floor dead load:260kg/㎡
Floor live load:500kg/㎡
Requirements:
This a two-story steel structure factory building for Agricultural Health Food production. Unlike the general warehouse or workshop that only stores goods and machines, this factory needs the appropriate temperature to make food processing safe and smooth. We were requested to finish the project within three months. The column distance is big and with a large live load of the upper floor.
Solution:
We suggested our customers to use EPS sandwich panel for the wall and roof, to achieve the effect of thermal insulation. The specification of the floor main beams are much larger than those of ordinary factory buildings.
Thanks to our workers and engineers, the whole building construction was completed within 3 months,on budget, safely and effectively, even in terrible weather conditions, and we made it!
Project Name:
800 Tons Two-story Steel Structure Building
Project Information:
Location: China
Area: 21096 square meters
36mx146.5mx14.6m(2 floors)*2 UNITS
Weight: 1060 tons
Wind resistance: 130km/h
Anti-seismic: 8 grade
Roof dead load: 25kg/㎡
Roof live load: 40kg/㎡
Floor load:500kg/㎡
This is another 2-story steel structure building project which has an area of more than 10000 square meter. The upper floor loading request is 500kg/㎡.
Solution:
Since there was no steel column in the middle of the second floor, our engineer suggested our client to use the round pipe for the roof truss beam, which is widely used in a large span workshops, warehouses, stations, airports, etc.
We offered 2 grades of steel standard GB Q235B and GB Q355B. For the main beam and post we chose GB Q355B grade, and for sub steel structure we chose GB Q235B grade. Both of them belong to ordinary steel, but the most biggest difference between them is the strength and intensity. The performance of Q345B is better than Q235B. Therefore, the cost of Q355B is a little bit higher than Q235B. For all the projects we provided the propose material list for the customer's reference according to their requirements case by case, and will also explained why we made this kind of suggestions. We built what they want!
Project Name:
Steel Structure Commercial Building
Project Information:
Location: Papua New Guinea
Area: 3630 square meters
Weight: 210 tons
Wind resistance: 110km/h
Anti-seismic: 8 grade
Roof dead load: 0.3KN/㎡
Roof live load: 0.35KN/㎡
Floor live load: 3.0KN/㎡
Floor dear load: 3.0KN/㎡
Requirements:
This project is about the construction of a 3-story steel commercial building.
Solution:
Our engineers customized the most reasonable design plan for this project. Our client is very satisfied with our design, which not only meets his requirements, but also saves the cost for him.
The local workers completely followed the installation drawings provided by our company without any mistakes and omissions. Our client was happy with this. After that, we keep a long term cooperation with this client.
Project Name:
9855 square meters steel structure warehouse
Project Information:
Location: Philippines
Area: 9855 square meters
Weight: 351 tons
Wind resistance: 137km/h.
Anti-seismic: 8 grade
Roof dead load: 25kg/㎡
Roof live load: 40kg/㎡
Requirements:
This steel structure warehouse project was sized about 9800 square meter. Since Philippines is an area of monsoon tropical rain forest climate, with high temperature, frequent rain, high humidity, and many typhoons. Our client had high requirement for the wind speed, then he would like to using a prefabricated steel structure method to build this warehouse.
Solution:
We designed two wind speed solution (137km / h and 250km / h) for his reference. After careful consideration, he finally chose the cost-effective solution with a wind speed of 137km / h.
We also sent one engineer to the construction site to instruct the installation work. Two months later, the installation work was completed successfully, and our client was totally happy with us.
Project Name:
1700 Square Meters Steel Warehouse with Mezzanine
Project Information:
Location: Qatar
Area: 1749 square meters
Weight: 100 tons
Roof dead load: 0.35 kN/㎡
Roof live load: 0.5 kN/㎡
Floor dead load: 3 kN/㎡
Floor live load: 10 kN/㎡
Wind speed or wind load: 110 km/h
Anti-seismic :7 grade
Requirements:
The steel warehouse project has a height about 13 meters with a 5-meter-height Mezzanine. The client requested the floor loading tob e 1000 kg/㎡. There is an accommodation nearby the warehouse and two separate walls(brick wall and sandwich wall). The columns of the warehouse and accommodation share the same foundation. They requested the warehouse area to match the original drawing that they have sent. And they will make the foundation first before we complete the production.
Solution:
After the calculation from our engineer, we offered GB Q355B grade for the steel construction, and used bigger size of H steel for the main beams and posts to achieve the floor loading request.
Considering the anchor bolt embedded into the concrete foundation, we advised our client to ship one container of the anchor bolt and sandwich panel first, so that they can start the foundation work as fast as they can.
If there are two separate walls for the steel building, enough space should be left to allow workers to go inside to install the wall panel. But this will lead to a smaller warehouse area or accommodation area. So we recommended them to share the same brick wall.
This not only met the requirements of our client to keep the same warehouse area, but also greatly saved customers' cost and installation time. Our client accepted our suggestions and totally supported our proposal.
Project Name:
1700 square meters steel warehouse with Mezzanine
Project Information:
Location: Israel
Area: 2335square meters
Size: 29m(L) x 81.3m(W) x 6m(H)
Wind speed: 110km/h
Anti-seismic: 7 grade
Roof dead load: 25kg/㎡
Roof live load: 40kg/㎡
Floor load:500kg/㎡
Requirements:
The total area of this steel structure building, our client's company, is about 2300 square meters, and has a warehouse and an office. Our client specifically required us to provide fences and the steel gate at the brick wall outside. The gate fences need to be printed with their company logo. After delivery, one of our engineers was sent to the construction site to guide the installation work, and sped up the installation process.