This case records the ongoing on-site installation of a steel building warehouse project in Malaysia. The construction is currently in progress, with steel components being assembled in sequence according to the approved drawings and site schedule.

At the project site, steel columns and main beams have been erected to form the primary structural frame of the warehouse. Secondary members, including bracing and purlins, are being installed to improve overall stability and prepare the structure for the next construction stages. All lifting and positioning work is carried out under controlled conditions to ensure accuracy and safety.

To adapt to Malaysia's tropical climate, steel materials are delivered in batches and installed shortly after arrival, minimizing prolonged exposure to humidity. Bolted connections are inspected during installation to maintain structural integrity and alignment.

This ongoing construction demonstrates the practical advantages of a steel building warehouse, including fast on-site assembly, clear construction logic, and efficient coordination. Further progress updates will be documented as the project continues.