As an industry-leading steel frame structure manufacturer, LiYou Steel delivers high-strength, customizable steel framing systems for commercial, industrial, and residential construction. Our steel frame structures combine durability, design flexibility, and cost-efficiency, making them ideal for:
✔ High-Rise Buildings – Skeleton frames with seismic-resistant engineering
✔ Industrial Facilities – Heavy-duty steel frames supporting cranes & machinery
✔ Warehouses & Distribution Centers – Long-span designs (up to 100m)
✔ Residential & Apartment Complexes – Light-gauge steel framing (LGSF) for fast construction
✔ Stadiums & Exhibition Halls – Architectural steel frames with curved or cantilevered designs
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Steel Frame Structure Warehouse
Guangdong, China
Industrial Area
3 years
total solution for projects
LYB-001
Steel Frame Structure Warehouse
Industrial
CE Certification
Industrial Commercial
C.Z Shape Steel Channel
Sliding Door
Customized Color
Sandwich Panel Optional
Aluminum Alloy Sliding Window
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Hot Dip Galvanized
25-60 days
Single item
1X1X1 cm
1.000 kg
✅ Superior Engineering & Customization
Advanced CAD & BIM Modeling (Tekla, Revit, STAAD.Pro)
Wind & Seismic Analysis (IBC, Eurocode, AS 4100 compliant)
Bolt-together or welded connections for fast assembly
✅ Premium Materials & Fabrication
Main Columns & Beams: ASTM A36/A572, Q355B steel
Secondary Framing: High-strength cold-formed sections
Corrosion Protection: Hot-dip galvanizing (85μm+) or 3-layer paint systems
Fireproofing Options: Intumescent coatings (up to 2-hour fire rating)
✅ Faster Construction & Cost Savings
40-60% quicker than concrete construction
Modular prefabrication reduces on-site labor
Lighter foundation requirements
✅ Global Certifications & Compliance
CE, ISO 9001, SGS, AWS D1.1 Welding Standards
LEED-compliant sustainable steel framing
✅ Full-Service Support
Design-to-installation turnkey solutions
In-house engineering & QA team
20-year structural warranty
️ Foshan Metro Line 3 (35,770m², 2,730 tons) – Multi-level steel frame with seismic bracing.
Guangdong Mingwei Phase II Workshop (20,350m², 1,126 tons) – Crane-supported steel framing for heavy manufacturing.
️ Philippine Exhibition Center (15,000m², 1,850 tons) – Column-free arched steel frame with 80m spans.
Australian Residential Tower (12,000m², 950 tons) – Light-gauge steel framing for high-speed construction.
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |
✅ Superior Engineering & Customization
Advanced CAD & BIM Modeling (Tekla, Revit, STAAD.Pro)
Wind & Seismic Analysis (IBC, Eurocode, AS 4100 compliant)
Bolt-together or welded connections for fast assembly
✅ Premium Materials & Fabrication
Main Columns & Beams: ASTM A36/A572, Q355B steel
Secondary Framing: High-strength cold-formed sections
Corrosion Protection: Hot-dip galvanizing (85μm+) or 3-layer paint systems
Fireproofing Options: Intumescent coatings (up to 2-hour fire rating)
✅ Faster Construction & Cost Savings
40-60% quicker than concrete construction
Modular prefabrication reduces on-site labor
Lighter foundation requirements
✅ Global Certifications & Compliance
CE, ISO 9001, SGS, AWS D1.1 Welding Standards
LEED-compliant sustainable steel framing
✅ Full-Service Support
Design-to-installation turnkey solutions
In-house engineering & QA team
20-year structural warranty
️ Foshan Metro Line 3 (35,770m², 2,730 tons) – Multi-level steel frame with seismic bracing.
Guangdong Mingwei Phase II Workshop (20,350m², 1,126 tons) – Crane-supported steel framing for heavy manufacturing.
️ Philippine Exhibition Center (15,000m², 1,850 tons) – Column-free arched steel frame with 80m spans.
Australian Residential Tower (12,000m², 950 tons) – Light-gauge steel framing for high-speed construction.
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |