Steel Structure Frame for Government Building

This is a district government office project in Papua New Guinea. Because the government needs to expand the office, the construction period is very urgent, which happens to be during our Spring Festival. Our factory worked overtime to complete the production and loading of all materials for the project within 20 days. The local government department praised the speed of China's manufacturing. We have completed more than 20 steel structure projects in our factory in the past five years.
Availability:
Quantity:
  • 7308900000

  • Column, Beam, Purlin, Bracing etc

1.Steel Structure Frame For Government Building Information: 


All the prefabricated buildings can be designed to meet the customized wind load, snow load, and seismic requirements for different countries and specific areas. A steel building system means all the steel structure frame components are cut, welded, and drilled at our factory. All of them are well prepared and ready for bolt-together assembly at the construction site.


The Project Aera: 6490                            Weight:  210 tons


Wind Resistance: 110km/h                                  Anti Seismic: 8 grade


Floor Dead load35kg/㎡           Floor Live Load:50kg/


2.Steel Structure Frame For Government Building  Planing & Drawing

Steel Structure frame drawing



3.Steel Structure Frame For Government Building  Installation Show:

district government office project


 Requirement

 This is a district government office project in Papua New Guinea. Because the government needs to expand the office, the construction period is very urgent, which happens to be during our Spring Festival. Our factory worked overtime to complete the production and loading of all materials for the project before 20 days. The local government department also praised the speed of our manufacturing in China. In the past five years, we have completed more than 20 steel structure projects in our factory.


Solution:

There are many projects in this project, including government office buildings, parking lots and chicken coops; each component of the steel structure has different sizes and arcs, and even one component needs to undergo several different arc treatments. Our colleagues in the technical department have repeatedly checked each drawing and each process to ensure that they are correct. Our quality inspectors strictly control the quality of each accessories, incoming steel materials and finished products.




4.About Guangdong Liyou Steel Structure.

Guangdong LiYou Steel Structure Engineering Co., Ltd. is headquartered in the National High-tech Development Zone, Shishan Town, Nanhai District, Foshan City, and the factory is located in Baini Town, Sanshui District, Foshan City. The head office was established on September 28, 2014. It is a service enterprise integrating steel structure consulting, design, production, construction, and maintenance. Mainly engaged in steel structure prefabricated buildings, including portal steel frames, pipe trusses, box columns/beams, steel lattice columns, H-shaped steel, and other steel structure products.

Liyou steel structure




5.Steel Structure Frame For Government Building Product Basic Info:


Place of Origin:

Type:

Foshan, China (Mainland)

High-Strength shed

Application:

Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing etc.

Standard:

Carbon Structural Steel:

GB

Q355, Q235B

Features:

Wind Resistance:

Waterproof, Fireproof, Earthquake Resistance

100km/H

Steel Structure Fabrication:

Life Span:

Sanding(2.5)Painting

Main Steel Structure 50 Years

Drawing Design:

Keywords:

AutoCAD, Tekla Structure, Vertex BD, SketchUp etc.

Steel structure parking lot



6.Steel Structure Frame For Government Building Material List: 


Main materials H Steel Beam HN198*99*4.5*7
H Steel Beam HN248*124*5*8
Steel Column 口120*4
Steel Column 口100*3
Ring Beam  口100*2
Horizontal Brace ∅16
Heel Block PL12*70*70
High Strength Bolt M16×50
Galvanized Bolt M12×35
Wall Purlin C100*50*20*2.0
Roof Purline C140*50*20*2.0
Roof Panel

50mm Thickness Rockwool sandwich 960#

 Color Steel 0.326mm 

Outside Wall Panel 

100mmThickness Rockwool sandwich  1150

#Color Steel0.326mm 

Partition Panel

100mmThickness Rockwool sandwich  1150

#Color Steel0.326mm 

Exterior Wall  PU Metal Panel 17×380×3800
Exterior Wall  PU Metal Panel 17×380×4100
Exterior Wall  PU Metal Panel 17×380×3200
Exterior Wall  PU Metal Panel 17×380×4300
Exterior Wall  PU Metal Panel 17×380×4095
Exterior Wall  PU Metal Panel 17×380×3760
Exterior Wall  PU Metal Panel 17×380×3250
C Steel Door Frame  W700*H1800
C Steel Door Frame  W900*H2000
C Steel Door Frame  W1500*H2000
C Steel Door Frame  W1800*H2000
Expansion Bolt M8×80
Self-tapping Screw M5×125
Self-tapping Screw M5×75
Self-tapping Screw M5×25
Self-tapping Screw M3.5×25
Color-Steel Gutter 0.5mm Color-steel 
Down Pie
PVC110


e8


Steel Car Parking Characteristics

● Low maintenance costs

● Environmentally friendly and recycling.

● Offer flexibility for fixing doors, windows and interior partitions

● Steel structure construction is strong, durable, and stable.

● Steel components are resistant to termites and other destructive insects.

● The service life of steel structure building is more than 50 years.

● Fast construction, easy installation, and convenient to transport.


What We Do?

01 Customized Design

Offer professional building planning & drawing, and suitable steel components according to your requirements.

02 Quality Assurance

● Strict quality control

● Safe packing

● Quality inspection before shipment

03 After-sales service

● Installation instruction on site

● Installation technical team backup

● Timely communication by Email & Phone


Payment Terms:
1) Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)
2) Delivery time: 15~30 days, usually as customers' order

Market:
Products have been exported to North America, the Middle East, Africa, Asia, and other countries and regions.


FAQ

Q 1: What should be prepare for the site before start to built?

At the very least, you need concrete piers for the columns to sit upon. Most people pour a full foundation, but if you are using the building on a farm or ranch and plan to have dirt, gravel, or sawdust floors, a pier system may be preferable. In these situations, a popular option is to combine piers with concrete footing around the perimeter of steel building.

Q2. Do you have a recommended foundation and associated drawing?

Yes, we will provide foundation drawing and installation drawing for you after shipment. But the foundation drawing is just for reference because land and soil are diverse in different area.

Q3. Can add a brick wall to my steel building?

Yes, you can. For combined durability and beauty there is nothing like adding brick finishes to  walls of your steel building. You receive the benefits of a hard wall, such as fire resistance, along with moisture resistance of a cavity wall.

Q4. Why does wind speed affect prices?

For most of the steel structure buildings, we design wind speed is about 110km/h. But for some strong wind countries,110km/h is not enough, like the Philippines and Mauritius 150~280km/h wind speed need to enlarge the beam and column, that will use more steel on it  then increase the price a lot.