As a leading steel structure manufacturer, LiYou is the trusted partner for structural steel contractors worldwide. We provide high-quality prefabricated steel components that enable contractors to:
✔ Reduce on-site labor by 30-40%
✔ Accelerate project timelines by 4-6 weeks
✔ Maintain consistent quality across projects
✔ Minimize construction waste
1. Contractor-Focused Manufacturing
Pre-drilled connection points
Pre-welded sub-assemblies
Clear component labeling
Installation manuals included
2. Precision Engineering Support
Shop drawings with contractor input
Connection detail optimization
BIM models for coordination
Load calculation reports
3. Reliable Supply Chain
Container-optimized packaging
Just-in-time delivery
Spare parts provision
Documentation packages (mill certs, MTC)
4. Competitive Advantages for Contractors
5-15% cost savings vs local fabrication
2-3 week faster fabrication lead times
Consistent quality control (EN 1090 EXC3)
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Hangar/Shed
Guangdong, China
Hangar
3 years
total solution for projects
GB
1. Galvanized 2. Painted
C.Z Shape Steel Channel
C/Z type
Galvanized bling bling
Customzation Size
Supporting Part
Easy and Simple Installation
Cold Rolled
Single item
1X1X1 cm
1.000 kg
Case Study: U.S. Warehouse Project
Contractor saved $280,000 using our prefab system
Erection time reduced from 12 to 8 weeks
Zero fabrication errors reported
Case Study: Australian School Project
100% bolt-up connections
All components arrived in installation sequence
Project completed 5 weeks early
Pre-cut and labeled framing members
Welded moment frames
Custom connection plates
Pre-assembled roof trusses
Stair towers and mezzanines
Technical Support Includes:
Erection sequence planning
Crane load charts
Field adjustment guidance
Quality control checklists
Case Study: U.S. Warehouse Project
Contractor saved $280,000 using our prefab system
Erection time reduced from 12 to 8 weeks
Zero fabrication errors reported
Case Study: Australian School Project
100% bolt-up connections
All components arrived in installation sequence
Project completed 5 weeks early
Pre-cut and labeled framing members
Welded moment frames
Custom connection plates
Pre-assembled roof trusses
Stair towers and mezzanines
Technical Support Includes:
Erection sequence planning
Crane load charts
Field adjustment guidance
Quality control checklists