LiYou Steel specializes in high-performance structural steel floor systems, offering durable, lightweight, and cost-effective solutions for commercial, industrial, and residential buildings. Our pre-engineered steel floors provide superior load-bearing capacity, fire resistance, and design flexibility compared to traditional concrete slabs.
✔ Higher Strength-to-Weight Ratio (40% lighter than pure concrete)
✔ Faster Installation (Reduces construction time by 30%)
✔ Applications: High-rise buildings, office spaces, parking structures
✔ Long Spans (up to 20m) without Intermediate Supports
✔ Easy Integration of HVAC & Electrical Systems
✔ Applications: Warehouses, shopping malls, schools
✔ Pre-fabricated for Rapid Assembly
✔ Enhanced Acoustic & Thermal Performance
✔ Applications: Residential apartments, hotels, hospitals
✔ Ideal for Modular & Prefab Construction
✔ Corrosion-Resistant (Galvanized Coating)
✔ Applications: Villas, lofts, mezzanine floors
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Office Building
Guangdong, China
Steel Structure
3 years
total solution for projects
Office
Modern
CE Certification
Industrial Commercial
C.Z Shape Steel Channel
Sliding Door
Customized Color
Sandwich Panel Optional
Aluminum Alloy Sliding Window
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Hot Dip Galvanized
25-60 days
Single item
1X1X1 cm
1.000 kg
item | value |
Material | Steel |
After-sale Service | Online technical support |
Application | Office Building |
Place of Origin | China |
Guangdong | |
Product Type | Steel Structure |
Warranty | 3 years |
Project Solution Capability | total solution for projects |
Use | Office |
Design Style | Modern |
Certification | CE Certification |
Application Fields | Industrial Commercial |
Purlin | C.Z Shape Steel Channel |
Door | Sliding Door |
Color | Customized Color |
Wall and Roof | Sandwich Panel Optional |
Window | Aluminum Alloy Sliding Window |
Drawing Design | SAP2000/AutoCAD /PKPM /3D3S/TEKLA |
Surface treatment | Hot Dip Galvanized |
Delivery time | 25-60 days |
✅ Custom Engineering – Tailored to your project’s load requirements (up to 10 kN/m²)
✅ Fireproofing Options – Intumescent coatings for up to 2-hour fire resistance
✅ Seismic-Resistant Designs – Compliant with IBC & Eurocode standards
✅ Global Supply – Shipped to USA, Australia, Africa & Europe
✅ Cost Savings – 20-40% lower than traditional concrete floors
Philippines Commercial Tower – 8,500m² composite steel floor (completed in 12 weeks)
Uzbekistan Industrial Plant – 12,000m² steel joist flooring (20m clear spans)
Canadian Residential Complex – Light gauge steel floors for 50+ modular units
✅ Comparison Table (Steel vs. Concrete Floors)
Feature | Steel Floors | Concrete Floors |
---|---|---|
Installation Time | 4-8 weeks | 12-20 weeks |
Weight | 40% lighter | Heavy, requires stronger foundations |
Design Flexibility | Highly customizable | Limited modifications |
✅ FAQ Section
Q: What is the maximum span for steel joist floors?
A: Up to 20m with proper support designs.
Q: Can steel floors reduce construction costs?
A: Yes! Savings of 20-40% due to faster installation & less foundation work.
✅ Call-to-Action Elements
Need a Custom Steel Floor Solution? Contact our engineers today for:
Free load calculations
3D modeling previews
Competitive pricing
Packing & Delivery
item | value |
Material | Steel |
After-sale Service | Online technical support |
Application | Office Building |
Place of Origin | China |
Guangdong | |
Product Type | Steel Structure |
Warranty | 3 years |
Project Solution Capability | total solution for projects |
Use | Office |
Design Style | Modern |
Certification | CE Certification |
Application Fields | Industrial Commercial |
Purlin | C.Z Shape Steel Channel |
Door | Sliding Door |
Color | Customized Color |
Wall and Roof | Sandwich Panel Optional |
Window | Aluminum Alloy Sliding Window |
Drawing Design | SAP2000/AutoCAD /PKPM /3D3S/TEKLA |
Surface treatment | Hot Dip Galvanized |
Delivery time | 25-60 days |
✅ Custom Engineering – Tailored to your project’s load requirements (up to 10 kN/m²)
✅ Fireproofing Options – Intumescent coatings for up to 2-hour fire resistance
✅ Seismic-Resistant Designs – Compliant with IBC & Eurocode standards
✅ Global Supply – Shipped to USA, Australia, Africa & Europe
✅ Cost Savings – 20-40% lower than traditional concrete floors
Philippines Commercial Tower – 8,500m² composite steel floor (completed in 12 weeks)
Uzbekistan Industrial Plant – 12,000m² steel joist flooring (20m clear spans)
Canadian Residential Complex – Light gauge steel floors for 50+ modular units
✅ Comparison Table (Steel vs. Concrete Floors)
Feature | Steel Floors | Concrete Floors |
---|---|---|
Installation Time | 4-8 weeks | 12-20 weeks |
Weight | 40% lighter | Heavy, requires stronger foundations |
Design Flexibility | Highly customizable | Limited modifications |
✅ FAQ Section
Q: What is the maximum span for steel joist floors?
A: Up to 20m with proper support designs.
Q: Can steel floors reduce construction costs?
A: Yes! Savings of 20-40% due to faster installation & less foundation work.
✅ Call-to-Action Elements
Need a Custom Steel Floor Solution? Contact our engineers today for:
Free load calculations
3D modeling previews
Competitive pricing
Packing & Delivery
content is empty!