2 Story Metal Building – Strong, Versatile & Cost-Effective Solutions
Need a reliable 2 Story Metal Building for your next project? LiYou Steel specializes in engineering and fabricating high-quality two-story metal buildings that are durable, customizable, and quick to assemble. Ideal for warehouses, offices, retail spaces, apartments, and mixed-use facilities, our 2 story metal buildings provide superior strength, fire resistance, and long-term cost savings compared to traditional construction.
Why Choose Our 2 Story Metal Buildings?
✔ Custom Designs – Tailored to your exact specifications
✔ Fast Installation – Pre-engineered components reduce build time
✔ Low Maintenance – Corrosion-resistant & weatherproof
✔ Global Compliance – Meets CE, ISO, SGS & international standards
✔ Proven Expertise – Successfully delivered projects in 20+ countries
Whether you need extra storage, workspace, or multi-level commercial space, our 2 Story Metal Building solutions maximize efficiency and durability. Contact LiYou Steel today for a free quote!
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Warehouse
Guangdong, China
Warehouse
3 years
total solution for projects
LYB-001
Warehouse
Industrial
CE Certification
Industrial Commercial
C.Z Shape Steel Channel
Sliding Door
Customized Color
Sandwich Panel Optional
Aluminum Alloy Sliding Window
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Hot Dip Galvanized
25-60 days
Single item
1X1X1 cm
1.000 kg
✅ Space-Saving Design – Double the square footage without expanding the foundation
✅ Cost-Efficient – Lower construction costs vs. traditional multi-story buildings
✅ Faster Build Time – Prefabricated steel components cut assembly time by 40%
✅ Durable & Low-Maintenance – Galvanized steel resists fire, rot, and pests
✅ Custom Floor Plans – Design for:
Retail (ground floor) + Offices (upper floor)
Workshop (1st floor) + Storage (2nd floor)
Garage (1st floor) + Apartment (2nd floor)
Turnkey prices include foundation, stairs, insulation, electrical, and interior finishes.
(Prices vary by design complexity, location, and local labor costs.)
✔ Structural Frame: High-strength Q355B steel columns & beams
✔ Floor System: Concrete over metal deck or steel-framed mezzanine
✔ Staircase: Internal or external (customizable)
✔ Load Capacity: Up to 150 PSF live load (adjustable for heavy equipment)
✔ Wall/Roof Panels: Corrugated or insulated options
Ground Floor: Storefront, restaurant, showroom
Upper Floor: Offices, coworking space
1st Floor: Vehicle repair, woodworking, manufacturing
2nd Floor: Inventory storage, tools
1st Floor: Car/RV parking
2nd Floor: Studio or 1-bedroom living space
Design & Permitting: 4-8 weeks
Manufacturing: 6-10 weeks
Assembly: 4-8 weeks
*(Total project time: 4-6 months for turnkey builds)*
✔ 25+ Years in Multi-Story Steel Construction
✔ Engineered for Safety – Meets IBC & local building codes
✔ Custom Engineering – Optimized for residential, commercial, or industrial use
✔ Global Shipping & Installation Support
Need financing or bulk pricing? Ask about:
Flexible payment plans
Developer discounts
Permit assistance
Build smarter with vertical steel construction!
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |
For a two-story metal building, the height typically includes the following:
Floor-to-Ceiling Height:
10 to 14 feet per floor is typical for commercial or residential spaces.
For two floors, this totals 20 to 28 feet.
Roof Structure:
The roof adds extra height depending on the design and slope (e.g., gable roof, low-slope roof).
Roof framing and pitch can add around 6 to 10 feet or more.
A two-story metal building is a structure made primarily from steel or metal materials, featuring two levels (floors). These buildings are commonly used for commercial, industrial, and residential purposes due to their durability, cost-effectiveness, and design flexibility.
The cost of a 2-story steel building typically ranges from $50 to $150 per square foot, depending on size, design complexity, and location. Custom finishes, insulation, and advanced features can add to the cost.
Some key benefits include:
Cost-Effective: Metal buildings are more affordable compared to traditional brick and mortar construction.
Durability: Steel is highly durable and resistant to fire, pests, and weather conditions.
Quick Construction: Pre-engineered metal buildings can be assembled quickly, reducing labor costs and construction time.
Design Flexibility: Metal buildings can be customized in terms of layout, size, and finish, offering flexibility for various uses.
With proper maintenance, a 2-story steel building can last 50 to 100 years or more. Regular inspections, rust protection, and timely repairs can significantly extend its lifespan.
The construction of a 2-story steel building typically involves:
Design & Planning: Architectural and structural designs are created, along with obtaining permits.
Foundation: A foundation is poured, which supports the steel frame.
Framing: The steel frame for both floors is constructed, including beams, columns, and the roof structure.
Roof & Walls: Roof trusses are installed, and exterior walls are framed and finished.
Interior Work: Drywall, insulation, flooring, and plumbing/electrical are installed.
Final Touches: Painting, trim, and final inspections are completed.
Insulation for a two-story metal building can be done using materials like fiberglass, spray foam, or rigid foam board. Insulation is essential to improve energy efficiency, reduce heating and cooling costs, and prevent condensation.
Yes, like any construction project, you will need to obtain permits, including building permits and zoning approvals, depending on local regulations. It's important to work with a contractor who is familiar with the requirements in your area.
Yes, metal buildings are highly resistant to extreme weather conditions, such as high winds, heavy snow, and earthquakes (with proper design). Steel's durability makes it a popular choice in areas prone to severe weather.
The construction time for a 2-story steel building can range from 3 to 6 months, depending on the size, complexity of the design, and availability of materials. Prefabricated components can speed up the process, while custom designs may take longer.
✅ Space-Saving Design – Double the square footage without expanding the foundation
✅ Cost-Efficient – Lower construction costs vs. traditional multi-story buildings
✅ Faster Build Time – Prefabricated steel components cut assembly time by 40%
✅ Durable & Low-Maintenance – Galvanized steel resists fire, rot, and pests
✅ Custom Floor Plans – Design for:
Retail (ground floor) + Offices (upper floor)
Workshop (1st floor) + Storage (2nd floor)
Garage (1st floor) + Apartment (2nd floor)
Turnkey prices include foundation, stairs, insulation, electrical, and interior finishes.
(Prices vary by design complexity, location, and local labor costs.)
✔ Structural Frame: High-strength Q355B steel columns & beams
✔ Floor System: Concrete over metal deck or steel-framed mezzanine
✔ Staircase: Internal or external (customizable)
✔ Load Capacity: Up to 150 PSF live load (adjustable for heavy equipment)
✔ Wall/Roof Panels: Corrugated or insulated options
Ground Floor: Storefront, restaurant, showroom
Upper Floor: Offices, coworking space
1st Floor: Vehicle repair, woodworking, manufacturing
2nd Floor: Inventory storage, tools
1st Floor: Car/RV parking
2nd Floor: Studio or 1-bedroom living space
Design & Permitting: 4-8 weeks
Manufacturing: 6-10 weeks
Assembly: 4-8 weeks
*(Total project time: 4-6 months for turnkey builds)*
✔ 25+ Years in Multi-Story Steel Construction
✔ Engineered for Safety – Meets IBC & local building codes
✔ Custom Engineering – Optimized for residential, commercial, or industrial use
✔ Global Shipping & Installation Support
Need financing or bulk pricing? Ask about:
Flexible payment plans
Developer discounts
Permit assistance
Build smarter with vertical steel construction!
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |
For a two-story metal building, the height typically includes the following:
Floor-to-Ceiling Height:
10 to 14 feet per floor is typical for commercial or residential spaces.
For two floors, this totals 20 to 28 feet.
Roof Structure:
The roof adds extra height depending on the design and slope (e.g., gable roof, low-slope roof).
Roof framing and pitch can add around 6 to 10 feet or more.
A two-story metal building is a structure made primarily from steel or metal materials, featuring two levels (floors). These buildings are commonly used for commercial, industrial, and residential purposes due to their durability, cost-effectiveness, and design flexibility.
The cost of a 2-story steel building typically ranges from $50 to $150 per square foot, depending on size, design complexity, and location. Custom finishes, insulation, and advanced features can add to the cost.
Some key benefits include:
Cost-Effective: Metal buildings are more affordable compared to traditional brick and mortar construction.
Durability: Steel is highly durable and resistant to fire, pests, and weather conditions.
Quick Construction: Pre-engineered metal buildings can be assembled quickly, reducing labor costs and construction time.
Design Flexibility: Metal buildings can be customized in terms of layout, size, and finish, offering flexibility for various uses.
With proper maintenance, a 2-story steel building can last 50 to 100 years or more. Regular inspections, rust protection, and timely repairs can significantly extend its lifespan.
The construction of a 2-story steel building typically involves:
Design & Planning: Architectural and structural designs are created, along with obtaining permits.
Foundation: A foundation is poured, which supports the steel frame.
Framing: The steel frame for both floors is constructed, including beams, columns, and the roof structure.
Roof & Walls: Roof trusses are installed, and exterior walls are framed and finished.
Interior Work: Drywall, insulation, flooring, and plumbing/electrical are installed.
Final Touches: Painting, trim, and final inspections are completed.
Insulation for a two-story metal building can be done using materials like fiberglass, spray foam, or rigid foam board. Insulation is essential to improve energy efficiency, reduce heating and cooling costs, and prevent condensation.
Yes, like any construction project, you will need to obtain permits, including building permits and zoning approvals, depending on local regulations. It's important to work with a contractor who is familiar with the requirements in your area.
Yes, metal buildings are highly resistant to extreme weather conditions, such as high winds, heavy snow, and earthquakes (with proper design). Steel's durability makes it a popular choice in areas prone to severe weather.
The construction time for a 2-story steel building can range from 3 to 6 months, depending on the size, complexity of the design, and availability of materials. Prefabricated components can speed up the process, while custom designs may take longer.