Pre Engineering Building Drawing

Pre-Engineering Building Drawing – Precision Design Solutions by Liyou Steel

As a leading pre-engineering building drawing provider, Liyou Steel delivers accurate, code-compliant structural designs that optimize material usage and construction efficiency. Our BIM-integrated design process ensures seamless coordination between architectural vision and structural reality.

Our Pre-Engineering Drawing Services

✔ Complete Design Package Includes:

  • Architectural layout drawings

  • Structural framing plans

  • Foundation design details

  • Steel connection drawings

  • MEP coordination drawings

✔ Advanced Software Capabilities:

  • Tekla Structures (3D modeling & detailing)

  • AutoCAD (2D drafting)

  • Revit (BIM coordination)

  • STAAD.Pro (structural analysis)

 
Availability:
Quantity:
  • Workshop

  • Modern

  • Guangdong, China

  • Lifetime

  • engineer guidance

  • Liyou

  • LY001

  • CE Certification

  • Industrial Commercial

  • C.Z Shape Steel Channel

  • Sliding Door

  • Customized Color

  • Sandwich Panel Optional

  • Aluminum Alloy Sliding Window

  • SAP2000/AutoCAD /PKPM /3D3S/TEKLA

  • Hot Dip Galvanized

  • 25-60 days

  • Single item

  • 1X1X1 cm

  • 1.000 kg

Key Benefits of Our Drawings

✅ Fabrication-Ready Accuracy (±1mm tolerance)
✅ Material Optimization (15-25% steel savings)
✅ Clash Detection (early problem identification)
✅ Global Code Compliance (AISC, Eurocode, GB)
✅ Fast Turnaround (2-3 weeks for typical projects)

Technical Standards

Component Design Standard
Beams AISC 360, EN 1993
Columns GB 50017, BS 5950
Connections AISC 341, Eurocode 3
Foundations IBC, EN 1997

Featured Project: Philippines Logistics Center

  • 12,000m² pre-engineered warehouse

  • 3D modeling reduced steel weight by 18%

  • Clash detection saved $35,000 in field changes

Start Your Project Today!

  1. Submit site data & requirements

  2. Receive preliminary drawings in 5 working days

  3. Approve final engineering package

 

PRODUCT SPECIFICATIONS


No
Components
Specification
Embedded Parts
1
Anchor Bolt
M24
2
High Strength Bolt
M20,10.9S
3
Common Bolt
M16
4
Galvanized Bolt
M12
5
Shear Nail
M16
6
Tir rod
∅32*2.5
Main Steel Structure Parts
1
Steel Column (Q355B)
H550*300*10*16
2
Wind Column (Q355B)
H400*220*6*10
3
Roof Frame Beam (Q355B)
H900~500*220*10*12 H500~650*220*8*12
4
Crane Beam (Q355B)
H650*320/240*10*16/14
5
Tie Bar(Q235B)
∅168*4.0
6
Horizontal Brace (Q235B)
∅168*4.0
7
Column Brace (Q235B)
∅25
8
Angle Brace (Q235B)
L63*5.0
9
Roof Purlin (Galvanized)
Z280*80*20*2.5
10
Wall Purlin (Galvanized)
C250*75*20*2.5
11
Connecting Plate
6mm-30mm
Other Steel Structure Parts
1
Roof Panel
50mm Rock wool Sandwich panel
2
Wall Panel
50mm Rock wool Sandwich panel
3
Gutter
2mm Galvanized Steel Plate
4
Down Pipe
PVC160 (Including parts)
5
Trimming
Color steel 0.5mm Gavanized steel panel


 

 
 
 
 
 
 
 
 
 
 
Previous: 