As a leading structural steel manufacturer in China, LiYou Steel Engineering Co., Ltd. provides high-quality, custom-fabricated steel structures for global construction projects. With ISO 9001, CE, AISC, and EN 1090 certifications, we ensure precision engineering, competitive pricing, and fast delivery for:
✔ Pre-Engineered Buildings (PEB) – Warehouses, factories, aircraft hangars
✔ Industrial Steel Structures – Platforms, pipe racks, mezzanines
✔ Commercial & Architectural Steelwork – Shopping malls, stadiums, facades
✔ Bridge & Infrastructure Components – Girders, trusses, support towers
50,000m² production plant in Foshan, Guangdong
CNC cutting, robotic welding, and automated painting
100+ ton monthly capacity for large-scale projects
Material certification (Mill Test Reports for all steel)
Dimensional accuracy (±1mm tolerance)
Non-destructive testing (UT/MT/RT) for critical welds
EN 1090 (EXC3) – European fabrication standard
AISC & AWS D1.1 – U.S. market compliance
CE & ISO 9001 – International quality assurance
30-50% cost savings vs. Western suppliers
8-12 weeks lead time from design to shipment
Door-to-door logistics (FOB, CIF, DDP options)
Availability: | |
---|---|
Quantity: | |
Steel
Online technical support
Hangar/Shed
Guangdong, China
Hangar
3 years
total solution for projects
GB
1. Galvanized 2. Painted
C.Z Shape Steel Channel
Metal Steel
Fast Building Construction
Solid H-shape Steel Beam
Multi-flunction
Customized Color
Customzation Size
Single item
1X1X1 cm
1.000 kg
Project | Location | Steel Tonnage | Key Features |
---|---|---|---|
Philippines Logistics Hub | Manila | 6,300 tons | 60m clear span, PEB design |
Uzbekistan Power Plant | Tashkent | 4,800 tons | High-temperature steel framing |
Dubai Expo Pavilion | UAE | 3,200 tons | Architectural steel facade |
Australian Mining Facility | Perth | 5,700 tons | Corrosion-resistant coating |
Language Spoken:English,Chinese
✔ Cost Efficiency – Lower labor & material costs
✔ High Production Capacity – Scalable for large orders
✔ Fast Turnaround – Shorter lead times than Western suppliers
✔ Custom Solutions – From light steel frames to heavy industrial structures
Contact us for a FREE quote & project consultation!
Project | Location | Steel Tonnage | Key Features |
---|---|---|---|
Philippines Logistics Hub | Manila | 6,300 tons | 60m clear span, PEB design |
Uzbekistan Power Plant | Tashkent | 4,800 tons | High-temperature steel framing |
Dubai Expo Pavilion | UAE | 3,200 tons | Architectural steel facade |
Australian Mining Facility | Perth | 5,700 tons | Corrosion-resistant coating |
Language Spoken:English,Chinese
✔ Cost Efficiency – Lower labor & material costs
✔ High Production Capacity – Scalable for large orders
✔ Fast Turnaround – Shorter lead times than Western suppliers
✔ Custom Solutions – From light steel frames to heavy industrial structures
Contact us for a FREE quote & project consultation!