Guangdong LiYou Steel Structure Engineering Co., Ltd.        +8619147784007     liyousteelstructure@outlook.com
You are here: Home / Products / Steel Structure Building / Two Story Metal Building of Warehouse

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Two Story Metal Building of Warehouse

Our Mezzanine Steel Structure Buildings are ideal for a wide range of construction purposes like livestock sheds, garages, plants, workshops, office buildings, airplane hangars, barns, commercial buildings, etc., for their super durability low maintenance. With our superior prefabricated steel components, the construction of a steel structure building will be economical, fast, and labor-saving.
Availability:
Quantity:
Two Story Metal Building Of Warehouse Planning  and drawing 

drawing3drawing1drawing2


Two Story Metal Building Of Warehouse Information 


Area: 36mx146.5mx14.6mTwo layers*2=21096                                            Weight: 1060 tons


Wind resistance: 130km/h                                                                                       Anti-seismic: 8 grade


Roof dead load: 25kg/㎡                               Roof live load: 40kg/


Floor load:500kg/

 



Requirement There is no steel column in the middle of the second floor, so the roof adopts tube truss steel beam, large span plant, warehouse, station, airport will use such tube truss.  

 

 


SolutionPipe truss processing requirements and technology is relatively high, the factory strictly in accordance with the national standards and steel structure construction specifications, successfully completed the entrusted task.  

 


Two Story Metal Building Of Warehouse Installation


mezzanine steel structure factory installation 3


mezzanine steel structure factory installation 1


mezzanine steel structure factory installation 2




Two Story Metal Building Of Warehouse Overview


Place of Origin:

Product Name:

Foshan, China (Mainland)

Steel Prefabricated Buildings

Material:

Q345 Q235 H Section Steel, C/Z Section Steel

Standard:

Type:

GB

Light Steel Frame

Size:

Color:

Up to Customer's Requirement

Customized

Roof & Wall Material:

Door:

Steel Sheet or Sandwich Panel

Rolling gate / Sliding Door

Window:

Finished:

Aluminum shutter

Paint or hot-dipped galvanized

Drawing Design:

Keywords:

AutoCAD, Tekla Structure, Vertex BD, SketchUp etc.

steel structure buildings for sale


Two Story Metal Building Of Warehouse  Material List



Embedded parts Components Specification
Anchor bolt M16*160
High strength bolt M20,10.9S
Common bolt M20
Turn buckle M20
Galvanized bolts M12
Brace Φ32*2.5
Tie rod Φ12
Main Steel Frame Steel Column(Q355B) H300~600X220X6X10
Wind column(Q355B) H350X200X6X8
Roof beam(Q355B)

H700~400X200X6X10、

H400~700X200X6X10

Tie rod ∅89*3.0
Horizontal bracing ∅20 steel bar
Column bracing ∅20 steel bar
Roof purlin(Galvanized) C160*50*20*2.0
Wall purlin(Galvanized) C160*50*20*2.0
Connecting plate 6~20mm steel sheet
Structure steel fabrication+sanding  Acetylene, oxygen, electrode,+Sa2.5


Two Story Metal Building Of Warehouse  Materials Display


Steel Prefabricated Buildings Components


Two Story Metal Building Of Warehouse  Benefits


Low maintenance costs

 Environmentally friendly and recycling.

 Offer flexibility for fixing doors, windows and interior partitions

 Steel structure construction is strong, durable, and stable.

 Steel components are resistant to termites and other destructive insects.

 The service life of steel structure building is more than 50 years.

 Fast construction, easy installation, and convenient to transport.


Two Story Metal Building Of Warehouse Applications


The steel structure building is widely used in Steel Garage, Plant, Warehouse, Workshop, Office Building, Hotel Building, Commercial Building , Residential House, Airplane Hangar, Outdoor Stadium Shed, Labour Camp, School, Exhibition Hall, Logistics Park, Refrigeration House, Resort, Dormitory Building, Shopping Mall, etc.

Steel Prefabricated Buildings Applications


About Guangdong Liyou Steel Structure


Guangdong LiYou Steel Structure Engineering Co., Ltd. is headquartered in the National High-tech Development Zone, Shishan Town, Nanhai District, Foshan City, and the factory is located in Baini Town, Sanshui District, Foshan City. The head office was established on September 28, 2014. It is a service enterprise integrating steel structure consulting, design, production, construction, and maintenance. Mainly engaged in steel structure prefabricated buildings, including portal steel frames, pipe trusses, box columns/beams, steel lattice columns, H-shaped steel, and other steel structure products.

Liyou steel structure



Why Choose Our Steel Prefabricated Buildings


01 Customized Design

Offer professional building planning & drawing, and suitable steel components according to your requirements.

02 Quality Assurance

● Strict quality control

● Safe packing

● Quality inspection before shipment


03 After-sales service

Installation instruction on site

Installation technical team backup

Timely communication by Email & Phone



Certification



Steel Prefabricated Buildings Certification


Steel Prefabricated Buildings Loading


Steel Prefabricated Buildings Loading

FAQ


Q: What should you provide before quotation?

A: Please send your design drawings, or sketches to us and tell us the materials you want to use. If you do not have the drawings, just inform us more data about the steel building you need, like the building total area, detail dimension, floor amount, roof load, wind load, etc.from all of your requests. If you can make a hand draft, that would be great helpful for us to get your idea.


Q: What accessories do we provide for customized steel buildings?

A: Along with the wall and roof insulation systems, we also offer skylights, commercial-grade ventilation devices such as roof turbine vents and wall louver vents, rolling door, and double sliding doors.


Q: Can the steel building be installed by yourself?

A: Certainly you can. The construction is a simple bolt-together process, which is easy if you have the needed access equipment. Every steel building we make comes with bolts, screws, downspout, gutters, flashing and clear instructions as to show you where everything is to be installed. And we will provide the installation drawing to you for reference.


Q: What should be prepared for the site before installation?

A: You will need concrete piers for the columns to sit upon. Most people pour a full foundation, but if your steel building is on a farm or ranch and there will be dirt, gravel, or sawdust on floors, a pier system may be preferable. In these situations, the popular option is to combine piers with a concrete footing around the perimeter of the building.


Q: Do we have a recommended foundation and associated drawing?

A: Yes, we will provide the foundation drawing and the installation drawing for you after shipment. But the foundation drawing is just for reference because the land and the soil are different in different countries.



Previous: 
Next: