At Liyou Steel Structure, we've perfected the steel structure construction process through years of global project experience. Our systematic approach ensures every project - from small workshops to massive stadiums - is completed with precision, safety, and cost-efficiency.
Availability: | |
---|---|
Quantity: | |
Workshop
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement, Other
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation, Others
Steel Workshop, garage shed, storage closet, buildings prefab workshop, steel warehouse, Hotel, Villa, Apartment, Office Building, Hospital, School, Mall, Sports Venues, Leisure Facilities, supermarket, Warehouse, Workshop, Park, Farmhouse, Courtyard, Other, Kitchen, Bathroom, Home Office, Living Room, Bedroom, Dining, Babies and kids, Outdoor, Storage & Closet, Exterior, Wine Cellar, Entry, Hall, Home Bar, Staircase, Basement, Garage & Shed, Gym, Laundry
Modern
Guangdong, China
Lifetime
engineer guidance
Liyou
LY001
CE Certification
Industrial Commercial
C.Z Shape Steel Channel
Sliding Door
Customized Color
Sandwich Panel Optional
Aluminum Alloy Sliding Window
SAP2000/AutoCAD /PKPM /3D3S/TEKLA
Hot Dip Galvanized
25-60 days
Single item
1X1X1 cm
1.000 kg
Project Planning & Design
Our engineers use Tekla, AutoCAD, and 3D3S to create optimized designs
Load calculations and stress analysis for structural integrity
Customized solutions for your climate and usage requirements
Material Procurement
Sourcing high-quality steel (ASTM/A36 standards)
Strict quality checks on all incoming materials
Selection of appropriate protective coatings
Fabrication & Manufacturing
CNC cutting for millimeter precision
Automated welding for consistent quality
Pre-assembly of components in our 50,000㎡ factory
Surface Treatment
Shot blasting for optimal surface preparation
3-layer protective painting system
Hot-dip galvanizing available for corrosive environments
Quality Control
3-stage inspection process:
Third-party certifications (SGS, TUV) available
Raw material verification
In-process fabrication checks
Final pre-shipment audit
Transportation & Logistics
Careful packaging to prevent damage
Container loading optimization
Documentation preparation for smooth customs clearance
On-Site Installation
Our certified installation teams
Heavy equipment for efficient assembly
Final inspections and testing
✔ 30% Faster Completion than traditional construction
✔ 5% Material Savings through optimized designs
✔ 10+ Year Warranty on structural integrity
✔ CE & ISO Certified quality assurance
Recent Project Example:
Philippine Logistics Warehouse (11,790㎡)
Design: 3 weeks
Fabrication: 8 weeks
Installation: 3 weeks
Total construction time: 14 weeks
PRODUCT SPECIFICATIONS
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |
Project Planning & Design
Our engineers use Tekla, AutoCAD, and 3D3S to create optimized designs
Load calculations and stress analysis for structural integrity
Customized solutions for your climate and usage requirements
Material Procurement
Sourcing high-quality steel (ASTM/A36 standards)
Strict quality checks on all incoming materials
Selection of appropriate protective coatings
Fabrication & Manufacturing
CNC cutting for millimeter precision
Automated welding for consistent quality
Pre-assembly of components in our 50,000㎡ factory
Surface Treatment
Shot blasting for optimal surface preparation
3-layer protective painting system
Hot-dip galvanizing available for corrosive environments
Quality Control
3-stage inspection process:
Third-party certifications (SGS, TUV) available
Raw material verification
In-process fabrication checks
Final pre-shipment audit
Transportation & Logistics
Careful packaging to prevent damage
Container loading optimization
Documentation preparation for smooth customs clearance
On-Site Installation
Our certified installation teams
Heavy equipment for efficient assembly
Final inspections and testing
✔ 30% Faster Completion than traditional construction
✔ 5% Material Savings through optimized designs
✔ 10+ Year Warranty on structural integrity
✔ CE & ISO Certified quality assurance
Recent Project Example:
Philippine Logistics Warehouse (11,790㎡)
Design: 3 weeks
Fabrication: 8 weeks
Installation: 3 weeks
Total construction time: 14 weeks
PRODUCT SPECIFICATIONS
No | Components | Specification | ||
Embedded Parts | ||||
1 | Anchor Bolt | M24 | ||
2 | High Strength Bolt | M20,10.9S | ||
3 | Common Bolt | M16 | ||
4 | Galvanized Bolt | M12 | ||
5 | Shear Nail | M16 | ||
6 | Tir rod | ∅32*2.5 | ||
Main Steel Structure Parts | ||||
1 | Steel Column (Q355B) | H550*300*10*16 | ||
2 | Wind Column (Q355B) | H400*220*6*10 | ||
3 | Roof Frame Beam (Q355B) | H900~500*220*10*12 H500~650*220*8*12 | ||
4 | Crane Beam (Q355B) | H650*320/240*10*16/14 | ||
5 | Tie Bar(Q235B) | ∅168*4.0 | ||
6 | Horizontal Brace (Q235B) | ∅168*4.0 | ||
7 | Column Brace (Q235B) | ∅25 | ||
8 | Angle Brace (Q235B) | L63*5.0 | ||
9 | Roof Purlin (Galvanized) | Z280*80*20*2.5 | ||
10 | Wall Purlin (Galvanized) | C250*75*20*2.5 | ||
11 | Connecting Plate | 6mm-30mm | ||
Other Steel Structure Parts | ||||
1 | Roof Panel | 50mm Rock wool Sandwich panel | ||
2 | Wall Panel | 50mm Rock wool Sandwich panel | ||
3 | Gutter | 2mm Galvanized Steel Plate | ||
4 | Down Pipe | PVC160 (Including parts) | ||
5 | Trimming | Color steel 0.5mm Gavanized steel panel |
content is empty!